Ybees 2017 is a giant success!
The 2017 Ybees Work Weekend was the best ever. We built a new deck and scenery fence on the Arts & Crafts Building. We added new steps on the Trading Post. We built new kayak and accessory racks at the new Boat House. We installed a new culvert across the Cabin Road and dug in new drainage for the Critter Corral. We set major new rock features at cabins, at the drainage way and at the Arts & Crafts Project. We organized the camp garage/shop. We cut up big logs for firewood for the Council Ring. We fixed the drinking fountain on the ShowerHaus. We graded the camp roads, moved piles of debris, drilled holes and set rocks with the Cat tractor. We treated the roughsawn siding at the Boat House.
And we had time for swimming, hiking, swimming in the lake and creek walks!
I'm sorry I didn't get a picture of every activity, but look over these images below. If you click on them, they will enlarge and give you a caption.
thanks!
dan
And we had time for swimming, hiking, swimming in the lake and creek walks!
I'm sorry I didn't get a picture of every activity, but look over these images below. If you click on them, they will enlarge and give you a caption.
thanks!
dan