In the Spring of 2014, the Ybees were asked to build a bridge over Goose Creek so kids could make use of beautiful Chapel Rock. We started with big plastic drain pipe, cut it into sections and then secured them into a structure with metal reinforcing and a wooden deck. It's designed to be removed in the off season to keep the rising water from carrying it downstream. So far... so good!